détails du projet:
- Destination: Casablanca
- Time of departure: 2024.12.17
- Lieu de départ : Nanjing
- Equipment: CHT20B Twin-screw extruder water cooling strand pelletizing line
- Application: Thermoplastic polymer research, Polymer blending, Filling modification
- Capacity: 1-10kg/h

The shipment was sent to Casablanca, departing from Nanjing on December 17, 2024. The equipment that was transported was a CHT20B Twin-screw extruder water cooling strand pelletizing line, used for thermoplastic polymer research, polymer blending, and filling modification, with a capacity of 1-10 kg/h.










